The Goodman MAD01 state-of-the-art data centre facility is purpose-built and strategically located. The site offers immediate operational readiness with established power infrastructure, ensuring seamless support for your data needs.
6 MW IT power
Multi-carrier connectivity
CCTV surveillance

First class/strategic location for the digital economy

Spain has established itself as one of Europe’s most attractive data centre markets, driven by rapid growth in digital usage and regulatory environment supportive of investment. At the heart of this momentum, Madrid is positioning itself as the strategic digital hub of the Iberian Peninsula.

Goodman Madrid Gate, which includes the revitalisation of more than 168,000 square metres of unused industrial land contributes to the provision of essential infrastructures to support Spanish digital economy.

Strategically situated along the A2 highway in the East Corridor, MAD01 offers unparalleled connectivity and a secure environment for businesses, making it an ideal location for enterprises seeking robust infrastructure and proximity to key markets. The site is located just 7 km from main Spanish DC hub of San Blas, which offers a great opportunity for interconnectivity.

Connectivity, power and low risk for data centre operations

  • 9 MW power capacity on site, and additional 8,6 MW secured
  • Direct connection to fibre network available at the plot
  • International Tiers 1 fibre carriers such as Colt, Lyntia, Reintel, Adamo, Arelion, Axent in close proximity
  • Low risk profile location outside of flooding and earthquake zones, as well as flight corridors from Madrid airport
  • No hazardous uses, high-risk industrial businesses or gas stations located in the immediate neighbourhood

Technical specifications

  • First phase of 6 and second phase of 5,7 MW IT
  • Tiers 3 compliant design
  • 2 tons floor load per sqm
  • Clear height: 6 m 
  • Certification: ISO27001 and ISO9001 included

Sustainability

We want our data centres to stand the test of time while minimising their environmental impact. Beyond transforming a brownfield site, MAD01 will be a GreenSpace+ property, including the following sustainability features:

  • Green building certification foreseen (LEED platinum targeted)
  • Waste heat recovery ready
  • EV parking
  • Green roofs and PV installation
  • Design includes efficient and state-of-the-art technical installations, including waterless cooling, resulting in a low PuE lowering electrical consumption.